0358 Nursery Bridge Structural Bearing Replacement Scheme 2026

Kim Frater, founder of Bid Trawler
Written by Kim Frater
Former Public Sector Buyer • Founder of Bid Trawler • 40+ years' public sector experience
"I believe public procurement shouldn't be complicated. Every guide I write explains the process in plain English so you can bid with confidence."

3 minute read  •  Updated August 2026

A practical guide to understanding what the buyer really wants and how to build a winning response.

Think beyond the construction

Yes, this is a tender to replace structural bearings.

But Wigan Council is not just buying construction work.

They're buying confidence that one of their key infrastructures will remain safe and functional for years to come. The Nursery Bridge carries Atherleigh Way over Pennington Brook in Leigh. It's a crucial part of the local transport network.

Your response should go beyond the technical details.

Focus on reliability and safety.

Pay attention to what they say

The notice makes it clear.

Wigan Council requires full risk assessments and method statements (RAMS) before work begins.

CDM 2015 regulations are also in play.

I'd ensure my submission demonstrates a robust understanding of these requirements. Show that you've got the expertise to navigate the complexities and manage risks effectively.

Who's affected by your work?

Think about the people who rely on the bridge.

Commuters. Pedestrians.

Anyone who uses Atherleigh Way will be affected by this work.

Your plan should minimise disruption. Aim for a seamless experience for the public.

If I were writing this tender, I'd include strategies for effective traffic management and communication with the public.

Evidence always beats promises

One thing I noticed when I worked in the public sector was that almost every bidder claimed to deliver an excellent service.

Very few proved it.

If you have evidence, use it.

  • Past projects where you’ve managed similar complex infrastructure works
  • Examples of successful RAMS implementation
  • Testimonials or references from previous clients

Emphasise your approach to risk management

The tender documentation mentions specific infrastructure challenges.

A 160mm mains water supply pipe and a 33kV electricity northwest cable could complicate things.

Outline how you'll manage these risks.

I'd want to see precise planning on how you'll prevent damage and ensure safety.

Don't underestimate the importance of method statements

Method statements might seem like just another piece of paperwork.

But they are crucial here.

They show that you can deliver what you promise.

And they demonstrate your understanding of the project's intricacies.

Make yours detailed and specific to this tender.

Consistency over the whole term

Replacing structural bearings is not a one-day job.

Your submission should speak to how you will maintain high standards throughout the project's duration.

Consider staffing, equipment maintenance and how you'll handle unexpected challenges.

Consistency is key.

Remember, it's not just about the technical work

Focusing solely on the technical aspects won't set you apart.

The ‘how’ is as important as the ‘what’.

Think about communication, stakeholder management and customer service.

Show that you can be a trusted partner for Wigan Council.

Common mistakes

Avoid submissions that:

  • Overlook the importance of comprehensive RAMS
  • Ignore the impact of your work on local residents and commuters
  • Fail to provide evidence of past successful projects
  • Underestimate the complexity of the existing infrastructure
  • Neglect to detail risk management strategies
  • Focus solely on technical aspects without considering public communication
  • Offer vague or generic method statements
  • Lack a clear plan for maintaining standards over the full project term

My Final Thoughts

Wigan Council is looking for more than a contractor.

They're looking for a partner who can ensure the safety and reliability of a critical piece of infrastructure.

The contract is valued at £650,000 and every pound should reflect quality and assurance.

Quality will be a key deciding factor, so your written submission must be strong.

Focus on detailed method statements, risk management and evidence of past success.

Thanks for reading.

I hope this guide has helped make public procurement feel a little less daunting. If it has, then it's done its job.

Kim
Founder, Bid Trawler

P.S. Got a question?

If you've got a question about anything you've read, or you're stuck on a tender, just send me an email.

Whether it's a quick question or you simply need pointing in the right direction, I'm always happy to help if I can.

kim@bidtrawler.com

Ready to decide whether this contract is worth bidding?

View the opportunity on Bid Trawler and access everything you need to make an informed decision, including the full tender information, direct access to the tender documents, the current supplier, who's winning similar contracts, who else may be bidding, buyer intelligence, our exclusive Inside View, your personalised Winnability Score and an AI-powered contract review.

View the Full Contract & Exclusive Inside View on Bid Trawler →
About our "How to Win This Contract" guides

Our guides are written using publicly available procurement information, including contract notices and published tender documents where available. They are designed to help suppliers understand the buyer's likely priorities and think more strategically about their approach. They are not based on any bidder's confidential submission, bespoke bid strategy or non-public procurement information.

More live contract guides

See all guides